Enphase Installer App shows a phase validation or phase rotation error
The Enphase Installer App shows a phase validation error or a phase rotation error and won't finish commissioning. This page covers what the errors mean, what to check first, and the causes behind them.
Error codes that go with this problem
| Code | What it means |
|---|---|
| Phase validation error (IQ Battery 10C) | The installer app has found a phase wiring problem between the two sub-units of an IQ Battery 10C. Commissioning is blocked until it is corrected. |
| Phase rotation error | On a three-phase site the system checks phase order to protect three-phase equipment. This error stops commissioning and can keep a System Controller's relays open. |
What to check first
- If your new system isn't running yet and your installer reports a phase error, commissioning can't finish until it is corrected. A phase rotation error can also keep a System Controller's relays open, so the system won't operate.
- On a three-phase site, the wrong phase order can come from the street supply itself, even when every phase colour looks right. Ask your installer whether the supply was tested.
- Call your installer to correct a phase error. It is wiring work on the battery or the installation.
The causes and the fixes
Partners see the causes behind this problem, most common first, the checks that tell them apart, and the fix for each, with part numbers and recent prices when a part is involved.